UKR TRANS MASH
UKR TRANS MASH

Mainline freight locomotive - 2ТЕ116

Project 2ТЕ116
01.

JSC "Ukrzaliznitsia"

2ТЕ116 - 1017, 1063, 1092, 1368

During the capital repair, the fire detection and suppression system TYSA-2 was installed

Although the TYSA-2 system was developed for the mainline freight locomotive 2te116, it can be adapted to other types of two-section locomotives, electric locomotives, and multiple unit trains

The equipment installation was carried out at Dnipropetrovsk locomotive repair plant

Details img

02.

Transchema

2ТЕ116 - 742

During the modernization of the locomotive, a number of devices of our production were installed, namely:

  1. Temperature monitoring system for axlebox and motor-axle bearings TERMOCON-3
  2. Set of headlights SLR-4/36
  3. Set of buffer lights LWR-1
  4. Locomotive body lamps LKK-2
  5. Driver’s cab lamps LKM-4

The modernization of the locomotive was carried out jointly with the Latvian locomotive repair plant AS "Daugavpils Lokomotīvju Remonta Rūpnīca"

Details img